Fabec is a multidisciplinary contractor in Mining services, civil Engineering, Building Engineering, Telecom Engineering, Green Energy, logistics, and Oil and gas. Fabec is a 100% local firm with an integrated management system in place. We are Certified by Bureau Veritas to ISO 9001:2015 for QMS; ISO 14001:2015 on Environmental System; ISO 45001:2018-on Occupational Health and Safety.
Fabec, since inception, has been involved in various projects in Tanzania and across the African continent. Fabec Headquarters is located in Dar es Salaam, Tanzania and has country offices in Kenya, Uganda, DRC, Congo-Brazzaville, Zimbabwe and Mozambique.
We also have local branches in Geita, Zanzibar, Sumbawanga, and Mwanza. Recently, we will also have sub-offices in Arusha and Dodoma
Fabec’s operational structure is divided into seven divisions, being:
Mining, Telecoms, Oil and Gas, Green Energy, Road Works, Water Resources, Logistics
Fabec has done several Mega projects, some completed and others ongoing, as follows:
1. We run various gold production operations in Geita Gold Mine – the largest open pit mine in Tanzania
2. We are constructing a pipe coating factory for EACOP- the Longest heated Crude oil Pipeline in East Africa, running from Hoima, Uganda, to Tanga, Tanzania. Fabec is involved from scratch in building this Thermal Insulation system factory, which will produce all pipes for the project.
3. We are constructing a demonstration plant for Uranium in the Mkuju River, whereby Fabec is doing all infrastructure for this project
4. We have also commissioned a Solar Farm in Kigoma, whereby Fabec was involved in the construction of the first and biggest solar plant, 5 MW, and this has already been connected to the Tanzania National Grid.


